Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.15.4.5.(3) | Application | Intent |
OS2 | OP2 | OH1 | OH4 | OS3 |
Objective | OS2 Structural Safety |
Attribution | |
Application | Application 1: Size, spacing and placement of reinforcement in cold
joints in flat insulating concrete form foundation walls
not subject to surcharge, for buildings to which
Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9], that are:
Exceptions:
except as stated in Sentence 9.15.1.2.(1), which applies to foundations and footings for buildings erected
on permafrost.
|
Top of Page | |
Intent | Intent 1: To limit the probability of insufficient reinforcement or
that reinforcement across a cold joint will not be adequately bonded to the
concrete, which could lead to tension loads not being transferred to each
side of the joint, which could lead to concrete cracking or the displacement
of foundation walls. This is to limit the probability
of compromised structural integrity, which could lead to:
This is to limit the probability of harm to persons.
|