Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.19.1.3.(2) | Application | Intent |
OH1 | OS2 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: Clear air space between insulation baffles and the
underside of the roof sheathing at the junction with exterior walls, in attic
and sloped roof assemblies, in buildings to which
Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9], where insulation is installed above the ceiling and below the
roof sheathing.
Exceptions:
except as stated in:
|
Top of Page | |
Intent | Intent 1: To limit the probability of inadequate airflow through the
vented space, which could lead to:
This is to limit the probability of:
This is to limit the probability of:
This is to limit the probability of harm to persons.
Intent 2: To exempt junctions of sloped roofs and exterior walls where
preformed baffles are installed from the minimum clear air space dimensions
specified in Sentence 9.19.1.3.(1), based on the demonstrated effectiveness
of a reduced unobstructed space provided by insulation baffles.
|