Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.27.2.2.(3)
OS2OH1
ObjectiveOS2 Structural Safety
Attribution
Application
Application 1: 
Break in continuity between drained and vented air spaces or drainage material installed to provide a capillary break between the cladding and backing assembly, in cladding assemblies to which Subsection 9.27.2. applies [see Article 9.27.1.1. for application of Subsection 9.27.2.], and concealed spaces in constructions that project over the top of such air spaces or drainage materials.
Top of Page
Intent
Intent 1: 
To limit the probability that moisture will transfer from drained and vented air space or drainage material in the wall into assemblies above the wall, which could lead to the accumulation of moisture.
This is to limit the probability of deterioration, which could lead to compromised structural integrity of attic or roof assemblies or of elements protected by attic or roof assemblies, which could lead to harm to persons.
Top of Page