Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.27.2.2.(6)
+
Application
Application 1: 
Omission of capillary breaks in cladding assemblies to which Sentence 9.27.2.2.(5) applies [see Article 9.27.1.1. for application of Subsection 9.27.2.], where:
  • it can be shown that the omission of a capillary break will not adversely affect the performance of building assemblies,
  • the building is an accessory building,
  • the exterior walls as well as intersecting or supported floors are constructed with non-moisture-susceptible materials, or
  • the exterior walls are constructed as mass walls with sufficient thickness to minimize the transfer of moisture to interior spaces.
Top of Page
Intent
Intent 1: 
To exempt exterior walls from the requirement to install a capillary break, where:
  • lesser protection will not adversely affect the performance of building assemblies,
  • damage to the building will have limited adverse consequences,
  • the walls, and intersecting or supported floors, are not susceptible to moisture damage, or
  • other methods are used to minimize moisture ingress.