This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
4.1.8.2.(4) | Application | Intent |
OS1 |
Objective | OS1 Fire Safety |
Attribution | |
Application | Application 1: Installation of fill pipes for the transfer of Class
I liquids into storage tanks from the top of
the tank, in buildings, structures and open areas.
Exceptions:
except:
Application 2: This also applies to the loading and unloading of tank vehicles, as required in Sentence 4.11.3.3.(1).
|
Top of Page | |
Intent | Intent 1: To limit the probability that vibrations due to inadequate
support will lead to the breakage or failure of the fill pipe, which could
lead to the 150 mm maximum clearance of the fill pipe from the
bottom of the tank being exceeded, which could lead to free-fall or splashing
of the liquid as it enters the tank, which could lead to the buildup of static
charges, which could lead to the ignition of vapour, which could lead to harm
to persons. |
Top of Page |