3.2.7.7.(1)

Objective

OP1 Fire Protection of the Building

Attribution

[F12-OP1.2]Applies to the requirement for a suitably identified shut-off valve outside the building.

Intent

Intent 1:

To limit the probability of delays in shutting off the fuel supply to emergency power systems in the event of its unwanted release in a fire situation, which could lead to the spread of fire, which could lead to damage to the building.

Top of Page