3.2.8.8.(2)

Objective

OP1 Fire Protection of the Building

Attribution

Intent

Intent 1:

To limit the probability of delays in locating and activating the switch controlling mechanical exhaust systems, which could lead to the spread of smoke from an interconnected floor space to floor areas in the building, which could lead to:

  • delays or inefficiencies in fire suppression operations, which could lead to the spread of fire, which could lead to damage to the building, and
  • damage to the building.