4.2.2.1.(1)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability that the ground conditions below any proposed building will not be taken into account in the design and construction of the excavation and foundation system, which could lead to excessive movements of the ground, which could lead to damage to the building.

Intent 2:

To facilitate, through qualification of persons involved with the investigation, the determination of compliance with this requirement.

Top of Page