5.6.1.2.(2)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that the performance of the installed masonry, with respect to integrity and protection against precipitation ingress, will fall significantly below expectations, which could lead to precipitation ingress into or through assemblies.

This is to limit the probability of:

  • the inadequate structural strength and integrity of the installation, which could lead to falling masonry components, or
  • deterioration, which could lead to compromised structural integrity of the separators or of elements supported or protected by the separators.

This is to limit the probability of structural failure, which could lead to harm to persons.