9.9.1.3.(1)

Objective

OS3 Safety in Use

Attribution

Intent

Intent 1:

To limit the probability of overcrowding, which could lead to delayed egress during emergency evacuation, which could lead to harm to persons.

Intent 2:

To determine the minimum design occupant load in order to calculate exit capacity.

Intent 3:

To expand the application of Article 3.1.17.1. to apply to Part 9 buildings.

Top of Page