9.10.20.1.(2)

Objective

OP1 Fire Protection of the Building

Attribution

Intent

Intent 1:

To limit the probability of delays or ineffectiveness in fire emergency response operations, which could lead to the spread of fire to other parts of the building, which could lead to damage to the building.

Top of Page