Intent 1:
To limit the probability of:
- an inadequate distribution of roof or floor loads transmitted
through framing elements, which could lead to overstressing of hollow
masonry units,
- an inadequate barrier, which could lead to termites
accessing structural wood elements, or
- the ingress of water into the cores of hollow masonry
units.
This is to limit the probability of
compromised structural integrity, which could lead to:
- structural failure,
- where elements support or are part of an environmental
separator, the displacement or failure of required environmental separation
elements, which could lead to the deterioration of building elements,
or
- an inability to resist expected loads, which could lead
to
- the excessive deformation or deflection of walls, or
- the excessive deflection or vibration of floors.
This is to limit the probability of:
- the space being unsuitable for its intended use, or
- damage to the building.