9.15.6.3.(1)

Objective

OP2 Structural Sufficiency of the Building

Attribution

[F61-OP2.3]Applies to elements that support or are part of an environmental separator.

Intent

Intent 1:

To limit the probability of discontinuity in dampproofing and waterproofing materials at form ties, which could lead to an inadequate resistance to water, which could lead to compromised integrity of elements supported or protected by foundations, which could lead to the ingress of moisture from the ground, which could lead to deterioration, which could lead to damage to the building.

Top of Page