9.16.3.2.(1)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability of an inadequate resistance to hydrostatic pressure, which could lead to:

  • the failure of floors-on-ground, or
  • the compromised structural integrity of floors-on-ground, which could lead to the ingress of moisture from the ground, which could lead to the deterioration of building elements.

This is to limit the probability of damage to the building.

Top of Page