9.16.3.3.(1)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of water ponding on floors, which could lead to deterioration, which could lead to the compromised structural integrity of floors-on-ground or of elements protected by floors-on-ground, which could lead to harm to persons.

Top of Page