9.20.8.2.(2)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of the exposure of joist ends to water that might penetrate the exterior wythe of cavity walls, which could lead to rotting of wood floor joists, which could lead to structural collapse, which could lead to harm to persons.

Top of Page