9.20.13.6.(3)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability of water running down the face of the sheathing membrane or insulating sheathing, which could lead to water entering the backing assembly.

This is to limit the probability of the deterioration of elements inboard of the masonry, which could lead to compromised structural integrity, which could lead to structural collapse, which could lead to damage to the building.

Top of Page