9.23.15.7.(3)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability of inconsistent thickness or excessive shrinkage of individual subfloor boards, which could lead to the deformation of finished flooring, which could lead to the space being unsuitable for its intended use.

Top of Page