9.27.4.1.(3)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of precipitation or meltwater ingress at unsealed vertical joints, which could lead to deterioration, which could lead to the structural failure of exterior walls or elements protected by exterior walls, which could lead to harm to persons.

Top of Page