9.28.6.3.(2)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of an inadequate physical bond between the first and second coats of stucco, which could lead to stucco being of inadequate strength to resist gravity, lateral or impact loads, which could lead to delamination.

This is to limit the probability of:

  • precipitation or meltwater ingress, which could lead to deterioration, which could lead to the structural failure of exterior walls or elements protected by exterior walls, or
  • stucco detaching and falling from the building.

This is to limit the probability of harm to persons.

Top of Page