9.29.10.4.(1)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability that the tile substrate will have an inadequate resistance to water.

This is to limit the probability of the deterioration of the substrate, which could lead to:

  • where the substrate for the tile contributes to the required bracing or lateral support for studs, the buckling or racking of walls, which could lead to structural failure, or
  • where the substrate for the tile supports required environmental separation elements, the excessive deformation, displacement or failure of such elements, which could lead to further deterioration, which could lead to further compromised structural integrity.

This is to limit the probability of:

  • the space being unsuitable for its intended use,
  • compromised operation of doors or windows, or
  • damage to the building.

Top of Page