4.1.8.4.(1)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that the earthquake design and analysis will not take into account the expected hazard results for the location, which could lead to structural failure, which could lead to harm to persons.

Top of Page