4.1.8.16.(3)

Objective

OP2 Structural Sufficiency of the Building

Attribution

(c)[F20-OP2.4]

Intent

Intent 1:

To limit the probability that the structural design of the ties between deep foundation members will not take into account the maximum expected seismic forces, with respect to preventing the foundation from spreading, which could lead to:

  • damage to the building, or
  • damage to the building, which could impede the intended use and occupancy of the building.

Top of Page