5.8.2.2.(7)

Objective

OS2 Structural Safety

Attribution

(b)[F61-OS2.3]

Intent

Intent 1:

To limit the probability that the performance of the installed dampproofing material, with respect to resistance to moisture transfer, will fall significantly below expectations, which could lead to moisture ingress from the ground, which could lead to deterioration, which could lead to compromised structural integrity of the separators or of elements supported or protected by the separators.

This is to limit the probability of structural failure, which could lead to harm to persons.

Top of Page