9.3.2.9.(5)

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability that performance, with respect to the protection of structural wood elements from termite infestation or decay, will fall significantly below expectations.

This is to limit the probability of compromised structural integrity, which could lead to:

  • structural failure,
  • where structural wood elements support or are used in an environmental separator, the displacement or failure of required environmental separation elements, which could lead to the deterioration of building elements, which could lead to further compromised structural integrity, or
  • an inability to resist expected loads, which could lead to:
    • the excessive deformation or deflection of walls, or
    • the excessive deflection or vibration of floors.

This is to limit the probability of:

  • the space being unsuitable for its intended use,
  • compromised operation of windows and doors, and
  • damage to the building.

Top of Page