9.4.2.2.(1)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that inaccurate snow load assumptions will lead to assemblies being unable to resist gravity, snow and rain loads.

This is to limit the probability of compromised structural integrity, which could lead to:

  • structural failure, or
  • for environmental separators or elements supporting environmental separators, the displacement or failure of required environmental separation elements, which could lead to the deterioration of building elements.

This is to limit the probability of harm to persons.

Top of Page