9.8.7.7.(2)

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of excessive spacing or inadequate placement of fasteners, or insufficient withdrawal resistance of fasteners, which could lead to the dislodgement of handrails, which could lead to persons falling, which could lead to harm to persons.

Intent 2:

To provide an alternative to the requirements of Sentence 9.8.7.7.(1), in situations where traditional methods of fastening are used for handrails serving a single dwelling unit.