9.20.3.2.(2)

Objective

OP2 Structural Sufficiency of the Building

Attribution

(b)[F21-OP2.1]

Intent

Intent 1:

To limit the probability of inadequate mortar density, which could lead to the excessive shrinkage, cracking and premature failure of mortar joints, which could lead to structural failure, which could lead to damage to the building.

Top of Page