9.33.10.2.(1)

Objective

OP1 Fire Protection of the Building

Attribution

Intent

Intent 1:

To limit the probability that the performance of factory-built chimneys will fall significantly below expectations, which could lead to excessive radiant heat loss, which could lead to failure at joints or to burn-through, which could lead to the ignition of combustible building components, which could lead to damage to the building.

Top of Page