3.3.6.3.(1)

Objective

OP1 Fire Protection of the Building

Attribution

(b)[F02-OP1.3]

Intent

Intent 1:

To facilitate the construction of explosion venting for the gas storage room.

This is to limit the probability that an explosion in the room will cause critical damage [structural or mechanical] to the room or the building, which could lead to damage to the building.

Top of Page