Intent 1:
To limit the probability that the braced wall panels
will not be adequately clad, sheathed or finished, which could lead
to an inability to develop the necessary load-resisting diaphragm
action, which could lead to an inability to resist expected lateral
loads, which could lead to excessive racking.
This is to limit the probability of:
- compromised structural integrity, or
- the excessive deformation, displacement or failure of
required environmental separation elements, which could lead to deterioration,
which could lead to compromised structural integrity.
This is to limit the probability of:
- the excessive deflection or vibration of floors, or
- the excessive movement or deformation of walls.
This is to limit the probability of:
- compromised operation of doors or windows required for
egress in an emergency, which could lead to delays in the evacuation
or movement of persons to a safe place, and
- persons losing their balance, tripping or falling.
This is to limit the probability of harm to persons.