Sentence 3.2.5.9.(3)

  1. +

Intent

Intent 1:

To supersede the requirements of Sentence 3.2.5.9.(1) and permit a different water supply flow rate than that of the referenced standard, on the basis that the specified flow rate is considered adequate, taking into consideration that the National Building Code of Canada has other provisions not covered by the referenced standard.

Top of Page