Sentence 6.2.8.1.(1)

  1. OE1

Objective

OE1 Resources

Attribution

Intent

Intent 1:

To limit the probability that constant-speed pressure booster systems will have insufficient water storage volume, which could lead to unnecessary operation or short-cycling of the booster pumps, which could lead to unnecessary consumption of energy, which could lead to excessive use of energy, which could lead to an unacceptable effect on the environment.

Top of Page