Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.20.12.2.(2) | Application | Intent |
OH1 | OS2 | OP2 | OH4 | OS3 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: In buildings to which Part
9 applies [see Sentence 1.3.3.3.(1) of Division A for application of
Part 9], corbeling of unit-masonry foundation walls
supporting above-ground, unreinforced masonry cavity
walls that are thicker than the foundation wall
on which they rest:
Exceptions:
except as stated in Sentence 9.20.1.1.(2), which applies to buildings other than described above, or where the masonry
is designed for specified loads on the basis of ultimate and serviceability
limit states.
|
Top of Page | |
Intent | Intent 1: To limit the probability that the cavity wall's centre of
gravity will be too far outboard of its supporting foundation, which could
lead to excessive eccentricity of loads, which could lead to cracking of cavity
walls. Where masonry foundation walls support an environmental
separator or act as one, this is to limit the probability of deformation or
cracking, which could lead to the excessive deformation, displacement or failure
of required environmental separation elements.
This is to limit the probability of:
This is to limit the probability of:
This is to limit the probability of:
This is to limit the probability of harm to persons.
|
Top of Page |