Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.25.3.2.(1)
OH1OS2OS1OS3
ObjectiveOS2 Structural Safety
Attribution
Application
Application 1: 
Characteristics of required air barrier systems, in buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
Top of Page
Intent
Intent 1: 
To limit the probability of an inadequate resistance of air barrier system components to air pressure loads, which could lead to:
  • rupturing, tearing or puncturing at fasteners, or
  • the opening of joints.
This is to limit the probability of a loss of airtightness, which could lead to:
  • condensation, or
  • precipitation ingress due to air pressure differences.
This is to limit the probability of deterioration, which could lead to compromised structural integrity of assemblies acting as or protected by environmental separators, which could lead to harm to persons.
Top of Page