Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.33.5.2.(1)
OP1OH1OS2OS3OS1
ObjectiveOH1 Indoor Conditions
Attribution
Application
Application 1: 
Installation of heating and air-conditioning equipment, including provisions for mounting, clearances and air supply, in buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
Exceptions: 
except as stated in:
  • Article 9.33.5.3., which applies to solid-fuel-burning stoves, ranges and space heaters, and
  • Article 9.33.5.4., which applies to fireplaces.
Top of Page
Intent
Intent 1: 
To limit the probability that the installation of heating or air-conditioning equipment and coupled ventilation systems will fall significantly below expectations, which could lead to inadequate performance or failure, which could lead to:
  • an inability to maintain adequate indoor air temperatures, which could lead to condensation, or
  • the inadequate replacement of indoor air with outdoor air or the distribution of outdoor air.
This is to limit the probability of:
  • the inadequate control of relative humidity,
  • the generation of pollutants from:
    • harmful micro-organisms and the media they grow on,
    • biological growth, or
    • materials that become unstable on wetting, or
  • the deterioration of building elements.
This is to limit the probability of:
  • negative effects on the air quality of indoor spaces, or
  • the inadequate thermal comfort of persons.
This is to limit the probability of harm to persons.
Top of Page