Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

2.4.10.4.(1)
OP5OS2
ObjectiveOS2 Structural Safety
Attribution
Application
Application 1: 
Hydraulic loads, in litres, from roofs or paved surfaces, in drainage systems for buildings.
Exceptions: 
except as stated in:
  • Sentence 2.4.10.4.(2), which applies to the installation of flow control roof drains, where
    • the maximum drain down time does not exceed 24 h
    • the roof structure has been designed to carry the load of the stored water
    • one or more scuppers are installed so that the maximum depth of water on the roof cannot exceed 150 mm,
    • they are located not more than 15 m from the edge of the roof and not more than 30 m from adjacent drains, and
    • there is at least one drain for each 900 m2, and
  • Sentence 2.4.10.4.(3), which applies to the determination of hydraulic loads for flow control roof drains and restricted paved area drains.
Top of Page
Intent
Intent 1: 
To limit the probability that the inappropriate calculation of the hydraulic load will lead to inadequately sized drainage systems, which could lead to an inability to drain roofs or paved surfaces adequately, which could lead to excessive structural loads, which could lead to structural failure, which could lead to harm to persons.
Top of Page