To limit the probability that the ground conditions below any proposed building will not be taken into account in the design and construction of the excavation and foundation system, which could lead to excessive displacement of the ground or collapse of the excavation, which could lead to damage to adjacent buildings.
To facilitate, through qualification of persons involved with the investigation, the determination of compliance with this requirement.