Sentence 4.4.2.1.(1)

  1. OS2
  2. OP2
  3. OH4

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability that the design, construction and maintenance of new parking structures for durability are not carried out in accordance with a suitable comprehensive standard in harmony with the detailed requirements of Part 4, which could lead to deterioration of structural components, which could lead to structural failure, which could lead to harm to persons.

Top of Page