Sentence 5.6.2.2.(3)

  1. OH1
  2. OS2
  3. OP2

Objective

OP2 Structural Sufficiency of the Building

Attribution

(b)[F21-OP2.6]

Intent

Intent 1:

To limit the probability of soil erosion, which could lead to compromised integrity of soils supporting the building, which could lead to movement, which could lead to damage to the building.

Top of Page