Intent 1:
To limit the probability of an inadequate resistance
to hydrostatic pressure, which could lead to:
- the failure of floors-on-ground, or
- the compromised structural integrity of floors-on-ground,
which could lead to the ingress of moisture from the ground, which
could lead to the deterioration of building elements.
This is to limit the probability of
damage to the building.