Sentence 9.20.8.5.(1)

  1. OH1
  2. OS2
  3. OP2
  4. OS1

Objective

OP2 Structural Sufficiency of the Building

Attribution

[F20,F22-OP2.3]Applies to elements that support or are part of an environmental separator.

Intent

Intent 1:

To limit the probability of excessive eccentricity of loads and instability.

This is to limit the probability of:

  • compromised structural integrity of masonry construction,
  • where masonry construction is part of an environmental separator, the displacement or failure of required environmental separation elements, which could lead to deterioration, or
  • an inability to resist expected loads, which could lead to:
    • the excessive movement or deformation of walls, or
    • the excessive deflection or vibration of floors.

This is to limit the probability of damage to the building.