Intent 1:
To limit the probability of an insufficient number
of bonding units, which could lead to inadequate load distribution
among wythes, which could lead to an inability to resist transverse
or vertical loads, which could lead to cracking or buckling.
This is to limit the probability of:
- compromised structural integrity of masonry construction,
- where masonry construction is part of an environmental
separator, the displacement or failure of required environmental separation
elements, which could lead to deterioration, or
- an inability to resist expected loads, which could lead
to:
- the excessive movement or deformation of walls, or
- the excessive deflection or vibration of floors.
This is to limit the probability of:
- the space being unsuitable for its intended use,
- compromised operation of windows or doors, or
- damage to the building.