Sentence 9.20.9.4.(8)

  1. OH1
  2. OS2
  3. OS1
  4. OH4
  5. OP2
  6. OS3

Objective

OP2 Structural Sufficiency of the Building

Attribution

[F20-OP2.3]Applies to elements that support or are part of an environmental separator.

Intent

Intent 1:

To limit the probability of:

  • flexural failure of the masonry spanning between intermediate tie locations,
  • tie pullout or pushthrough (i.e. embedment failure),
  • ties buckling, or
  • tie material failure.

This is to limit the probability of cracking or buckling of cavity wall constructions in areas that typically experience higher levels of lateral stress, such as near floor or roof assemblies.

This is to limit the probability of:

  • compromised structural integrity of masonry construction,
  • where masonry construction is part of an environmental separator, the displacement or failure of required environmental separation elements, which could lead to deterioration, or
  • an inability to resist expected loads, which could lead to:
    • the excessive movement or deformation of walls, or
    • the excessive deflection or vibration of floors.

This is to limit the probability of:

  • the space being unsuitable for its intended use,
  • compromised operation of windows or doors, or
  • damage to the building.