Sentence 9.20.13.4.(1)

  1. OS2
  2. OP2
  3. OH1
  4. OS1

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability of:

  • precipitation or meltwater ingress, or
  • compromised thermal performance of components intended to resist heat transfer.

This is to limit the probability of:

  • the deterioration of masonry due to freeze-thaw stresses, or
  • the deterioration of masonry elements, which could lead to compromised structural integrity.

This is to limit the probability of damage to the building.

Top of Page