Sentence 9.26.4.7.(1)

  1. OH1
  2. OS2

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To limit the probability of cracking or tearing of built-up roof membranes (when returned up walls at a sharp angle) due to their shrinking or pulling away from the substrate, or movement of the structure.

This is to limit the probability of precipitation or meltwater ingress, which could lead to the structural failure of roofs or walls, or elements protected by such assemblies, which could lead to harm to persons.

Top of Page