Sentence 9.26.11.8.(2)

  1. OH1
  2. OS2

Objective

OS2 Structural Safety

Attribution

Intent

Intent 1:

To exempt from the requirement for a dry layer of felt as stated in Sentence (1), constructions where taped joints and primed sheathing provide extra protection against the absorption and leakage of rain or meltwater [same intent as Sentence 9.26.11.8.(1)].

Top of Page