Intent 1:
To limit the probability that performance will fall
significantly below expectations with respect to substrate preparation,
application of surface primer, preparation and application of rubberized
asphalt, including the treatment of cracks and joints, and membrane
flashing.
This is to limit the probability of
the premature failure of roofing, which could lead to:
- water penetrating directly to roof decking or sheathing,
or
- compromised thermal performance of components intended
to provide resistance to heat transfer.
This is to limit the probability of:
- an inadequate control of relative humidity, temperatures
of interior spaces or water accumulation,
- the generation of pollutants from biological growth
or from materials that become unstable on wetting, or
- deterioration, which could lead to compromised integrity
of roofs or assemblies protected by roofs.
This is to limit the probability of:
- negative effects on the air quality of indoor spaces,
- the inadequate thermal comfort of persons, and
- contact with moisture.
This is to limit the probability of harm to persons.