Sentence 9.29.4.1.(1)

  1. OS2
  2. OH1
  3. OS1
  4. OP2

Objective

OP2 Structural Sufficiency of the Building

Attribution

Intent

Intent 1:

To limit the probability that the performance of plaster finishes will fall significantly below expectations, which could lead to an inability to resist expected impact, gravity or lateral loads.

This is to limit the probability of the deformation or detachment of interior finishes, which could lead to:

  • where interior finishes contribute to the required bracing or lateral support for studs, the buckling or racking of walls, which could lead to structural failure, or
  • where interior finishes support or provide the substrate for required environmental separation elements, the excessive deformation, displacement or failure of such elements, which could lead to deterioration, which could lead to further compromised structural integrity.

This is to limit the probability of:

  • the space being unsuitable for its intended use,
  • compromised operation of doors or windows, or
  • damage to the building.