To limit the probability that the performance of caulking will fall significantly below expectations, which could lead to the premature failure of caulking, which could lead to the failure of tiles and substrates on repeated exposure to water, which could lead to the ingress of water into assemblies.
This is to limit the probability of the deterioration of the substrate, which could lead to:
This is to limit the probability of harm to persons.